Joseph feels we have about 180 hours left. The only roadblock we discovered now is the spigot pins. Robert needs to inspect them. The is some corrosion and the glass around the mounts needs to be replaced. I just hope the pins don't need to be replaced.
He also worked on the cleanup on the fuselage canopy tracks. Over the past week and a half, I cleaned up the resin squeeze out that was on the inside canopy frame. Joseph will be working on the final fit and fairing cleanup over this next week.
Today, we worked on the left wing. Joseph worked on the fairings, and we installed the new replacement aileron pushrod for the one that was corroded. I have finished glassing over the bolts in on the airbrakes.
No comments:
Post a Comment