Welcome to a work in progress

This blog is dedicated to the restoration and modification of a Glasflügel Standard Libelle H201B, and a tribute to those who have dared to do the same, and to those who are helping with seeing this dream take flight.

Sunday, May 4, 2014

Count Down to First Flight!

The count down has begun!

Over this past weekend, Robert became current in the Libelle 201B after flying the clubs glider.

Joseph showed up on Saturday to put the mylar on the control surfaces, while I continued working on the trim out of the cockpit.



Sunday, I finished the cockpit! All the padding is in and the plastic is off!

The electronics are working!

All that is left to do is the final weights and balance, and the verification of the travel on the control surfaces, which I was told will be done on Tuesday!

The transponder needs to be certified, and the compass needs a correction card, but all is looking good (weather permitting) for a test flight next Saturday!

Cameras are charging and the Champagne is chilling!





So, here she is before, ...4 years ago!








 And here she is now!!



Sunday, April 27, 2014

A Brighter Image!

Today, I was able to get the Antenna/balun connected to the radio COAX, and tested it!. The speaker is now wired up and I secured any loose wiring.

I finished connecting the aileron linkage and airbrake controls. The airframe is now ready to be assembled for testing of the control surfaces. Robert told me today that he will have the W/B on the control surfaces finished this week.

I set the main gear doors and have the bungees in place, tested the gear retracts and all looks good.


Finally, I peeled away the plexi protective coating,

... and inspected the canopy.

There are a few scratched inside, near the aft area near the frame, but it is light, and can be polished out.














So, this week, I believe all that is left is up to Robert now. The control surfaces still need to have their weights and moments calculated. After that is done,  I can finish sealing the wings, rudder and elevators. Drop in the seat pan, seatback, and get the final W/B on the bird! All of this can be done on Saturday!

We are just about ready for that first test flight!



Saturday, April 26, 2014

The Devil is in the Details

Over the past week poor Joseph was polishing and touching up the paint on the winglets and the cockpit. I told him to stay home this weekend and to not worry about the glider.

When I came in on Saturday, the glider was waiting for me in the booth, ready for me to start trimming out the details.

The first thing I noticed was the painted registration and tail letters were blended smoothly into the white paint.

My first task was to add the Libelle logo to the tail, which I had vinyl transfers made at Fastsigns.

The transfers were better than the decals I bought. They too looked like they were painted on.

My next tasks was to rivet the serial number plate back on, and grind down the screw ends in the hat shelf cover.

A happy milestone since the plate was removed four years ago!


I then added the speaker, and GRP straps to the inside to secure the speaker wires.



I adjusted the release cable under Roberts guidance, secured the turnbuckle with safetly wire, swedged the T-handles for the Release and Pedal adjustment.

I also spent most of the day cleaning the bearings and removing the years of dust and grime that have been collecting on them.


The water ballast dump system controls were added ....
... and tested.

As I was walking out of the booth this evening, this is what I see!
Sunday, I will be finishing getting the antenna reconnected and tested, and continue the clean out of dust and grime build up.
 

Tuesday, April 22, 2014

Getting Closer and Closer!!!!

Last week, Joseph and I spent nine days working to finish painting the glider and put a dent in polishing it out!.
 
Saturday both wings were brought back into the shop.

They were cleaned and then sanded down with 400 grit to get them prepped for painting.


 
Saturday and Sunday we painted the wings.

 
Monday it was snowing and too cold to paint, so we started polishing out the top of the right wing, and prepped the area of the bottom to get it ready to paint the competition letters. Also, the horizontal, rudder, and ailerons were painted

We also brought in the fuselage, and prep sanded the primer for painting on Tuesday


Tuesday morning, the fuselage was moved into the booth, and was painted.

We had another set back when I found out that the blue accents were not in compliance with the type certification of the Libelle, and the blue paint that was on one of the winglets had to be removed. We had to repaint the rudder due to some moisture contamination in a couple of areas.

Wednesday, yet another set back, Robert wanted us to move the wings back into the trailer to make room for a cleanup and repair on another glider.
We were able to bring in the right wing to get the bottom prepped for the competition letters. Later in the day, we moved the fuselage back into the booth and we masked the registration numbers and the competition letters.

By late afternoon, the blue paint was applied.

Thursday and Friday were pretty much the same as Wednesday. There were a couple of setbacks with painting and cleanup. The wing spar stubs needed to be painted, and the horizontal need another coat.


Saturday and Sunday, we did nothing but remove the masks and fine sanded the wings and fuselage for the final polishing


Joseph did the final polishing on the wings! They are like mirrors!
















Although it was no milestone event, the wingtip wheels were finished and painted too!













All that was left after nine days of work is the fuselage, horizontal and rudder need to be polished.

If all goes well, the glider will be ready for me to finish the interal linkage inspection with Robert and perform the final trim out of the cockpit this next weekend. Then assembly, W&M,W&B, and then out to test fly!


Sunday, April 13, 2014

The week to finish the painting

This is the WEEK!... We are finally able to paint!!!!. OMG after 4 years the glider is white again!

Photos to follow!

I will update this post at the end of the week, I took this week off from work to get this plane done.

As it goes, we just finished painting the wings. They are awesome! All that is left to paint is the fuselage, canopy, ailerons, and rudder!.


Mid-week update

I was told that the blue markings that were originally planned, cannot be used due to the fact that they are a violation of the Type Certification of the glider. There was even a question on whether or not I could use the blue on the registration and competition letters.


Sunday, March 23, 2014

4 years now .... and nearing the home stretch!

Update on the project - Mid-March

We are now just a little over the 4 year mark on when I first found this Libelle on the SSA Classified Ads. So, where are we?

I created a punch list of things left to do:

Wings
           
Mount winglet spring pins.

Fuselage
            
Forward wing alignment bar primed, painted gray.
            Cockpit back and inside under ledge – painted gray.
            Safety wire on bolts in gear well – release turnbuckle – Aileron cantilevers.
 Canopy
            Repaint interior frame.
           


Horizontal Stabilizer
             Primed and painted

Rudder
            W/B - painted.


Ailerons
            W/B - and painted.
All we need now is a couple of weeks of good steady warm weather to paint the plane!
I'm still optimistic that we will be done by the end of April!

Monday, March 10, 2014

Getting Closer!!

Over this past week, Joseph knocked out the repair cleanup on the horizontal stabilizer.. 

..... and the fairing.



He was also near to the finished on the canopy frame.




All there is left to cleanup and prime are the ailerons.

This week, I picked up the metal wingtip wheel frames and can start on making the fairing covers for them.

They will be mounted to the winglets after we get the glider assembled and we can see how they will need to be positioned to prevent the ailerons from dragging the runway during the take off roll.








The shop at the airport is geting busy, and Joseph will need to break from the Libelle project over the next 3 weeks. But that will also be about the time the weather will hopefully warm up enough to allow us to apply the paint!